Sagarmala (Ports and Waterways) Projects

  • Home
  • Sagarmala (Ports and Waterways) Projects

Big Public Sector Ports

Service
Location State Status
Belekeri Port Karnataka Under Construction
New Bedi Port Gujarat Partially Constructed
Sagar Port West Bengal Under Construction
Astaranga Port Odisha DPR under preparation
Mahanadi Riverine Port Odisha DPR under preparation
Paradip Outer Harbour Odisha DPR under preparation
Sirkazhi Tamil Nadu Techno Economic Feasibility Report (TEFR) prepared
Kanniyakumari Port Tamil Nadu Major Transhipment Port at Kanyakumari. SPV formed for the purpose – March, 2019
Dugarajapatnam Port Andhra Pradesh DPR completed
Galathea Bay Transhipment Port Great Nicobar DPR has been completed, the proposed port will come at Galathea Bay in Great Nicobar Island of the Union Territory of Andaman and Nicobar Islands. Syama Prasad Mookerjee Port, Kolkata (SMPK) is the nodal agency for undertaking development of proposed port project in landlord mode.
Machilipatnam Port Andhra Pradesh Construction work started on 22 May 2023
Bhavanapadu Port Andhra Pradesh DPR completed
Kalingapatnam Port Andhra Pradesh DPR completed
Ramayapatnam Port Andhra Pradesh Under construction
Meghavaram Port Andhra Pradesh DPR completed
Nargol Port Gujarat Gujarat Government invited the bids
Vadhavan Port Maharashtra Under Construction

Private Ports

Location State Status
Angré Port Jaigad, Maharashtra
Agardanda Shipyard & Terminal Agardanda, Maharashtra Agardanda Port has entered into an agreement with the Maharashtra Maritime Board, State Government of Maharashtra, to run a 50-year development and operations concession at the port near Mumbai. Agardanda Terminal is a container terminal acquired by Adani Group which was shipyard previously.
Bhavnagar CNG Terminal Gujarat On 28 September 2022 the foundation stone was laid for CNG terminal, the development of CNG Terminal and other terminals occurred at the north-side of existing Bhavnagar Port in December 2019 by the consortium led by Foresight Group, a consortium of London-based Foresight Group, Mumbai-based Padmanabh Mafatlal Group and Rotterdam-based Boskalis signed a Memorandum of Understanding (MoU) with Gujarat Maritime Board (GMB) for development of the CNG terminal. Bhavnagar Port Infrastructure Pvt Ltd, a special purpose vehicle formed by the consortium to operate the port.
Chhara LNG Terminal Gujarat HPCL Shapoorji Energy Private Limited (HSEPL), the entity which is currently building a 5 MMTPA LNG terminal in Chhara, Gujarat. HSEPL is constructing a 5 MMTPA Liquified Natural Gas (LNG) Terminal at Chhara, Gujarat, at a project cost of about Rs 4,300 crore which is likely to be completed by the end of calendar year 2022. The terminal will have all facilities for receipt of LNG through ocean going tankers, marine unloading, storage, LNG Road Tanker loading, regasification, and supply of regasified LNG to the gas grid.
Dighi Port Dighi, Maharashtra
Rohini Yard Rohini, Maharashtra
Simar Port Gujarat Completion target 2024
JSW Salav Port Salav, Maharashtra Expansion of existing Salav jetty facility from present 235 m jetty length and 21m mooring dolphin by adding additional jetty length of 500 m to handle cargoes from present 3.0 MPTA to 31.0 MPTA.
Karanja Port Navi Mumbai, Maharashtra The port is being developed over 200 acres of land with a sea frontage of 1,000 metres at Karanja Creek. The port is in the heart of the commercial capital of India, and acts as the gateway to eight landlocked states in the country. The facility has access to State and National highways and is near to India's largest and most congested container port, the Jawaharlal Nehru Port (JNPT).
JSW Keni Port Karnataka On 17th November 2023, Construction started at the port in Keni, near Ankola, would be designed to handle 30 million tonnes of cargo per annum.
JSW Nangaon Port Maharashtra Bidding underway
Pavinakurve Port Karnataka Pavinakurve will have capacity to handle 14 mt of cargo in the initial phase
Konkan LNG Terminal Dabhol, Maharashtra
Tajpur Port West Bengal DPR under preparation
Tadadi Port Karnataka DPR under preparation
Tuna Port Gujarat Adani Group started the port in 2015 as Dry cargo terminal for coal but now expanding to Container terminal
Kakinada Gateway Port Andhra Pradesh Under construction, Kakinada Gateway Port (KGPL), an arm of Kakinada SEZ, has entered into concession agreement with the Andhra Pradesh government for development of a greenfield commercial port at Kona village in East Godavari district. Kakinada SEZ (KSEZ) is promoted by GMR Infrastructure limited.
Vizhinjam International Seaport Kerala Partially operational

National Waterways

Project Type Location Status Notes
National Waterway 4 Waterway Telangana, Andhra Pradesh, Tamil Nadu and Puducherry Under Construction National Waterway 4 (NW-4) is a 1,095 kilometres (680 mi) long waterway in India. It has been declared as an Indian National Waterway and is currently under development. It connects the Indian states of Telangana, Andhra Pradesh, Tamil Nadu, and the union territory of Puducherry. The NW-4 runs along the Coromandal Coast through Kakinada, Eluru, Commanur, Buckingham Canals and also through part of Krishna and Godavari rivers in South India. It was declared a National Waterway on 24 November 2008 under the Provisions of National Waterways Bill, 2006.
National Waterway 1 Waterway Uttar Pradesh, Bihar, West Bengal Under Construction Ganga-Bhagirathi-Hooghly River system is located in India and runs from Prayagraj in Uttar Pradesh to Haldia in West Bengal via Patna and Bhagalpur in Bihar across the Ganges River. It is 1,620 km (1,010 mi) long, making it the longest waterway in India.

Ferry

Project Location Status Notes
Kochi Water Metro Kochi Completed Kochi Water Metro is an integrated ferry transport project in Greater Kochi region proposed by Kochi Metro Rail Limited. It serves as a feeder service to suburbs along with rivers where transport accesbility is limited. The project obtained the final environment clearance in Oct 2019, and its first phase completed in 2021 . On 15 February 2021 Kerala CM Pinarayi Vijayan inaugurated its first route between Vytilla and InfoPark constructed under Phase I of the project. The inauguration was a pre-election cosmetic inauguration as services did not begin until March 2022. The new announced date to start services was moved to July 2022.