Five Power transmission line projects in India:

  1. Wardha – Aurangabad Line

    The Wardha – Aurangabad Line is a 1,200kV overhead line with a length of 696Ckm running from Wardha to Aurangabad. The project is under construction and is expected to be commissioned in 2024. The Wardha – Aurangabad Line is an overhead line that will be operated by Power Grid Corporation of India. The line will carry alternating current (AC) through double circuit cable. Buy the profile here:
    SGEL gains contract to develop 1.35GW solar projects in Maharashtra, India
    SSE partners OCU Energy and Fluence for 150MW BESS project in UK

  2. Amroha – Gajraula Line

    The Amroha – Gajraula Line is a 765kV overhead line with a length of 25Ckm running from Amroha to Gajraula. The project is under construction and is expected to be commissioned in 2024. The Amroha – Gajraula Line is an overhead line that will be operated by Uttar Pradesh Power Transmission. The line will carry alternating current (AC) through double circuit cable.

  3. Bilhaur – Sandila Line

    The Bilhaur – Sandila Line is a 765kV overhead Bilhaur to Sandila. The project is under construction and is expected to be commissioned in 2024. The Bilhaur – Sandila Line is an overhead line that will be operated by Uttar Pradesh Power Transmission. The line will carry alternating current (AC) through single circuit cable.

  4. Dhuvaran – Chharodi Line

    The Dhuvaran – Chharodi Line is a 765kV overhead line with a length of 240Ckm running from Dhuvaran to Chharodi. The project is planned and is expected to be commissioned in 2025. The Dhuvaran – Chharodi Line is an overhead line that will be operated by Gujarat Energy Transmission. The line will carry alternating current (AC) through double circuit cable.

  5. Dopaha – Varanasi Line

    The Dopaha – Varanasi Line is a 765kV overhead Dopaha to Varanasi. The project is under construction and is expected to be commissioned in 2024. The Dopaha – Varanasi Line is an overhead line that will be operated by Uttar Pradesh Power Transmission. The line will carry alternating current (AC) through double circuit cable.