Project | Type | Location | Status | Notes |
---|---|---|---|---|
Bhanupli–Leh line | Regional Rail Connectivity | Himachal Pradesh and Ladakh | Planned | |
Port Blair — Diglipur rail line | Rail line | Andaman and Nicobar Islands | Planned | The Indian Government has given a green signal to the 240-km rail line project in Andaman & Nicobar islands, connecting Port Blair from Diglipur. The railway line will be constructed with a cost of Rs 2,413.68 crore. |
Char Dham Railway | Regional Rail Link project | Uttarakhand | Under construction | The Char Dham Railway, the Indian Railways's under construction twin railway lines, will complement the Char Dham Highway project by connecting the holiest places of Hinduism called Chota Char Dham |
Airoli-Kalwa Rail Link Project | Regional Rail Link project | Mumbai | Under construction | |
North Eastern Railway Connectivity Project | Regional Rail Link project | Northeast India | Under construction | |
Taranga Hill–Ambaji–Abu Road line | Hill railway line | Gujarat and Rajasthan | Under construction | It will connect famous pilgrimage such as Taranga hill and Ambaji with Abu road. |
Udhampur-Srinagar-Baramulla Rail Link(USBRL) | Tunnel and rail line | Kashmir | Completed | |
Koderma–Hazaribagh–Barkakana–Ranchi line | Rail line | Jharkhand | Completed | |
Barkhera-Budni Third Line | Rail line | Madhya Pradesh | Completed | |
Sivok–Rangpo line | Rail line | Northeast India | Completed |
Line | Length | Border State | FLS | Cabinet construction funding approval | Construction status | Comment |
---|---|---|---|---|---|---|
Murkongselek–Pasighat–Tezu–Rupai line | 227 km[22][23] | China (Eastern sector) Arunachal Pradesh, Assam | Yes | No | Not commenced | Map |
Missamari–Tenga–Tawang line | 378 km[22][23] | China, Bhutan (Eastern sector) Arunachal Pradesh, Assam | Yes | No | Not commenced | Map |
Lakhimpur–Along–Silapathar line | 249 km[22][23] | China (Eastern sector) Arunachal Pradesh, Assam | Yes | No | Not commenced | Map |
Bhanupli–Manali–Leh line | 498 km[22][23] | China, Pakistan (Western sector) Himachal Pradesh, Ladakh | Yes | No | Not commenced | Map |
Srinagar–Kargil–Leh line | --- | China, Pakistan (Western sector) Ladakh, Jammu and Kashmir | ? | No | Not commenced | Map |
Pathankot–Leh line | --- | China, Pakistan (Western sector) Ladakh, Punjab | No | No | Not commenced | Map |
Dehradun–Uttarkashi line (Gangotri) | --- | China (Central sector) Uttarakhand | Completed | Yes | Under construction, see Char Dham Railway. | Map |
Rishikesh–Karanprayag line (via Chamoli) | --- | (Central sector) Uttarakhand | Completed | Yes | Under construction, also see Char Dham Railway. | Map |
Tanakpur–Jauljibi line | --- | Nepal (Central sector) Uttarakhand | No | No | Not commenced | Map |
Tanakpur–Bageshwar line | --- | (Central sector) Uttarakhand | No | No | Not commenced | Map |
Jammu–Akhnoor–Poonch line | --- | (Western sector) Jammu and Kashmir | No | No | Not commenced | Map |
Patti–Ferozepur line | --- | Pakistan (Western sector) Punjab | No | No | Not commenced | Map |
Anupgarh–Chattargarh–Motigarh–Bikaner line | --- | Pakistan (Western sector) Rajasthan | No | No | Not commenced | Map |
Jodhpur–Agolai–Shergarh–Phalsund line | --- | Pakistan (Western sector) Rajasthan | No | No | Not commenced | Map |
Jodhpur–Jaisalmer line doubling | --- | Pakistan (Western sector) Rajasthan | Yes | Map |
Train Number | Project | Photo | Location | Status | Description |
---|---|---|---|---|---|
Mumbai–Ahmedabad high-speed rail corridor | High-speed rail line | Gujarat and Maharashtra | Under construction | India's first high-speed rail line | |
Silver Line (K-Rail) | High-speed rail | Thiruvananthapuram and Kasaragod | Planned | The Silver Line is a proposed higher-speed rail line in India that would connect Thiruvananthapuram, the capital city, and Kasaragod of Kerala state. | |
Vande Bharat (trainset) (Train 18) | Semi high-speed rail | List of Vande Bharat Express in service | Completed | The Vande Bharat Express, previously known as Train 18, is a semi-high-speed, electric multiple unit train operated by the Indian Railways on 18 routes as of June 2022. It was designed and manufactured by the Integral Coach Factory (ICF) at Perambur, Chennai under the Make in India initiative. | |
Amrit Bharat | Semi high-speed rail | Completed | |||
Namo Bharat (trainset) | Semi high-speed rail | Completed | 10 trainsets have been delivered till now. | ||
Vande Bharat (sleeper trainset) | Semi high-speed rail | Under construction | With the induction of the sleeper version of Vande Bharat, Indian railways aim to complete Delhi-Mumbai and Delhi-Kolkata journeys in 12–14 hours. | ||
Mission Raftaar | Semi high-speed rail | Under construction |
System | Locale | State / Union Territory | Lines | Stations | Length (Under Construction) | Length (Planned) | Construction began | Planned Opening |
---|---|---|---|---|---|---|---|---|
RapidX | New Delhi, Ghaziabad & Meerut | Uttar Pradesh | 1 | 22 | 17 km (11 mi) | 82 km (51 mi) | 2020 | 2023 |
System | Locale | State / Union Territory | Lines | Stations | Length (Under Construction) | Length (Planned) | Construction began | Planned Opening |
---|---|---|---|---|---|---|---|---|
Bhoj Metro | Bhopal | Madhya Pradesh | 2 | 28 | 27.87 km (17.32 mi) | 77 km (48 mi) | 2018 | March 2024 |
Indore Metro | Indore | Madhya Pradesh | 5 | 89 | 16.21 km (10.07 mi) | 33.53 km (20.83 mi) | 2018 | August 2024 |
Patna Metro | Patna | Bihar | 2 | 26 | 16.86 km (10.48 mi) | 30.91 km (19.21 mi) | 2020 | August 2027 |
Surat Metro | Surat | Gujarat | 2 | 38 | 40.35 km (25.07 mi) | 40.35 km (25.07 mi) | 2021 | December 2027 |
Cuttack–Bhubaneswar–Puri Metro | Cuttack, Bhubaneswar, Puri | Odisha | 1 | 20 | 26 km (16 mi) | 30 km (19 mi) | 2024 | TBD |
Thane Metro | Thane | Maharashtra | 1 | 22 | 29 km (18 mi) | TBD | TBD | |
Chandigarh Metro | Chandigarh Capital Region | Chandigarh | 5 | TBD | 64 km (39.7 mi) | TBD | TBD | |
Prayagraj Metro | Prayagraj | Uttar Pradesh | 2 | 39 | 40 km (25 mi) | TBD | 2025 | |
Varanasi Metro | Varanasi | Uttar Pradesh | 2 | 21 | 29.235 km (18.166 mi) | TBD | TBD | |
Gorakhpur Metro | Gorakhpur | Uttar Pradesh | 2 | 27 | 27.41 km (17.03 mi) | TBD | TBD | |
Ranchi Metro | Ranchi | Jharkhand | 2 | 27 | 16.2 km (10.1 mi) | TBD | TBD | |
Coimbatore Metro | Coimbatore | Tamil Nadu | 5 | 147 | 147 km (91 mi) | 2018 | 2027 | |
Madurai Metro | Madurai | Tamil Nadu | 1 | 18 | 31 km (19 mi) | TBD | TBD | |
Salem Metro | Salem | Tamil Nadu | 5 | 25 | TBD | TBD | TBD | |
Visakhapatnam Metro | Visakhapatnam | Andhra Pradesh | 3 | 54 | 76.90 km (47.78 mi) | TBD | TBD | |
Guwahati Metro | Guwahati | Assam | 4 | 54 | 61.42 km (38.16 mi) | TBD | TBD | |
Greater Gwalior Metro | Gwalior | Madhya Pradesh | 3 | 21 | 58.1 km (36.1 mi) | TBD | TBD | |
Dehradun Metro | Dehradun | Uttarakhand | 2 | 73 | 73 km (45 mi) | TBD | TBD | |
Srinagar Metro | Srinagar | Jammu and Kashmir | 2 | 28 | 25 km (16 mi) | TBD | TBD | |
Coimbatore Metro | Coimbatore | Tamil Nadu | 5 | 147 | 147 km (91 mi) | 2018 | 2027 | |
Bareilly Metro | Bareilly | Uttar Pradesh | 6 | 80 | 117.3 km (72.9 mi) | TBD | TBD |
Project | Image | Location | Status | Notes | Year (completion) |
---|---|---|---|---|---|
Anand Vihar | New Delhi | Under Construction | Indian Railways’ ambitious station redevelopment plan, the Indian Railway Station Development Corporation (IRSDC) will soon be working on giving the Anand Vihar railway station a new look that will be similar to any airport. | - | |
Ayodhya Junction railway station | Ayodhya, Uttar Pradesh | Completed | - | 2024 | |
Banaras railway station | Uttar Pradesh | Completed | - | 2019 | |
Belagavi railway station | Karnataka | Completed | - | 2023 | |
Bijwasan railway station | New Delhi | Under Construction | Bijwasan railway station is a railway station in Bijwasan neighborhood of South Delhi. | 2024 | |
Dharwad railway station | Dharwad | Completed | - | 2022 | |
Hazrat Nizamuddin railway station | New Delhi | Completed | Indian Railways redevelops Delhi's Hazrat Nizamuddin railway station! As part of its station redevelopment and beautification drive, Indian Railways has upgraded the Hazrat Nizamuddin railway station of the national capital. Several passenger-friendly amenities have been added at the station in the past few years. | 2019 | |
Gandhinagar Capital railway station | Gandhinagar, Gujarat | Completed | Gandhinagar Capital is a major railway station with a 5-star hotel on its top in the city of Gandhinagar, Gujarat. | 2019 | |
Gurgaon Railway Station | Gurgaon, Haryana | Completed | Redevelopment project of the Gurugram Railway Station, with an estimated cost of ₹300 crore, through video conferencing. The design of the station building will reflect the local culture, heritage, and architecture and provide modern facilities to the passengers by ensuring universal access to the railway station. | 2024 | |
Gomti Nagar railway station | Lucknow, Uttar Pradesh | Completed | Prime Minister inaugurated Gomti Nagar station in Uttar Pradesh, redeveloped at a total cost of around Rs 385 crores. To cater to the increased future passenger footfall, this station has segregated arrival and departure facilities. It integrates both sides of the city. | 2024 | |
New Delhi railway station | New Delhi | Completed | In March 2020, long-term plans for a public private partnership (PPP) to change the railway station to improve passenger flow was described, with the Rail Land Development Authority put in charge. | 2021 | |
Rani Kamalapati railway station | Bhopal, Madhya Pradesh | Completed | The Ministry of Railways privatised Habibganj railway station in June 2017, making it India's first private railway station. The station will have facilities like a shopping complex, forex kiosk and eateries. | 2019 | |
Sir M. Visvesvaraya Terminal | Bangalore | Completed | Sir M. Visvesvaraya Terminal, Bengaluru railway station (station code: SMVB) is an Indian Railways train station located in Baiyyapanahalli, Bangalore in the Indian state of Karnataka. | 2022 | |
SSS Hubballi Junction | Hubli | Completed | The platform number 1 of Hubli Junction has a length of 1,507 metres, making it the longest railway platform in the world as of March 2023. | 2023 | |
Shri Mata Vaishno Devi Katra railway station | Katra, Reasi district | Completed | Shri Mata Vaishno Devi Katra railway station is a railway station on the Jammu Udhampur Srinagar Baramulla Railway Link in the Indian Union Territory of Jammu and Kashmir. It mainly serves for the town of Katra where the major Hindu divine temple Shri Mata Vaishno Devi is situated. | 2014 | |
Varanasi City railway station | Varanasi, Uttar Pradesh | Completed | - | 2024 |
Project | Type | Location | Status | Notes |
---|---|---|---|---|
Marathwada Rail Coach Factory (MRCF), Latur - RVNL | Rail factory | Maharashtra | Completed | The Marathwada Rail Coach Factory, a project of RVNL in Latur, Maharashtra produced its first coach shell on Good Governance Day i.e. 25.12.2020. This state-of-the-art factory was set up and commissioned in just two years by RVNL to manufacture self-propelled trains for Indian Railways. Setting up of this factory was proposed in February 2018 and the Ministry of Railways assigned this project to RVNL. Vande Bharat Express production to start in the factory in the near future. |
Medha Servo Drives | Railway coach factory | Kondakal, Hyderabad | Under Construction | Medha Servo Drives, which designs and manufactures high-tech electronics for locomotives, is setting up a railway coach factory at Kondakal near Hyderabad in Telangana, involving an investment of Rs 1,000 crore. |
RINL Forged Wheel Plant | Wheel factory | Raebareli | Completed | - |
Rail Coach Naveenikaran Karkhana (RCNK) - RVNL | Rail factory | Sonipat | Completed | Rail Vikas Nigam Limited successfully commissioned the Rail Coach Naveenikaran Karkhana at Sonipat, Haryana in October 2021. The company had been entrusted with the development of this Rail Coach Workshop as a turnkey project. The Rail Coach Naveenikaran Karkhana at Sonipat is the first of its kind facility being set up to cater to the mid-life rehabilitation and refurbishment of coaches. The Rolling Stock Complex is designed for sustainable development with Industry 4.0 compliant assembly line. Vande Bharat Express production to start in the factory in the near future. |
Railway Manufacturing Unit (RMU) | Wagon Factory | Kazipet, Telangana | Under construction | Indian Railways is going to set up a railway wagon manufacturing unit in Telangana. The unit will be constructed on 160 acres of land in Kazipet at an estimated cost of ₹521 crore and is expected to be completed by February 2025. The Rail Vikas Nigam Limited (RVNL) was entrusted with this project. |