if You need any Information or suggestions so you can write to us on [email protected]

TitGati Shakti (Railways) Projects

  • Home
  • Gati Shakti (Railways) Projects

Gati Shakti (Railways) Projects

Passenger Transport

Service
Project Type Location Status Notes
Bhanupli–Leh line Regional Rail Connectivity Himachal Pradesh and Ladakh Planned
Port Blair — Diglipur rail line Rail line Andaman and Nicobar Islands Planned The Indian Government has given a green signal to the 240-km rail line project in Andaman & Nicobar islands, connecting Port Blair from Diglipur. The railway line will be constructed with a cost of Rs 2,413.68 crore.
Char Dham Railway Regional Rail Link project Uttarakhand Under construction The Char Dham Railway, the Indian Railways's under construction twin railway lines, will complement the Char Dham Highway project by connecting the holiest places of Hinduism called Chota Char Dham
Airoli-Kalwa Rail Link Project Regional Rail Link project Mumbai Under construction
North Eastern Railway Connectivity Project Regional Rail Link project Northeast India Under construction
Taranga Hill–Ambaji–Abu Road line Hill railway line Gujarat and Rajasthan Under construction It will connect famous pilgrimage such as Taranga hill and Ambaji with Abu road.
Udhampur-Srinagar-Baramulla Rail Link(USBRL) Tunnel and rail line Kashmir Completed
Koderma–Hazaribagh–Barkakana–Ranchi line Rail line Jharkhand Completed
Barkhera-Budni Third Line Rail line Madhya Pradesh Completed
Sivok–Rangpo line Rail line Northeast India Completed

Geostrategic border rail lines (PHASE - I)

Line Length Border State FLS Cabinet construction funding approval Construction status Comment
Murkongselek–Pasighat–Tezu–Rupai line 227 km[22][23] China (Eastern sector) Arunachal Pradesh, Assam Yes No Not commenced Map
Missamari–Tenga–Tawang line 378 km[22][23] China, Bhutan (Eastern sector) Arunachal Pradesh, Assam Yes No Not commenced Map
Lakhimpur–Along–Silapathar line 249 km[22][23] China (Eastern sector) Arunachal Pradesh, Assam Yes No Not commenced Map
Bhanupli–Manali–Leh line 498 km[22][23] China, Pakistan (Western sector) Himachal Pradesh, Ladakh Yes No Not commenced Map
Srinagar–Kargil–Leh line --- China, Pakistan (Western sector) Ladakh, Jammu and Kashmir ? No Not commenced Map
Pathankot–Leh line --- China, Pakistan (Western sector) Ladakh, Punjab No No Not commenced Map
Dehradun–Uttarkashi line (Gangotri) --- China (Central sector) Uttarakhand Completed Yes Under construction, see Char Dham Railway. Map
Rishikesh–Karanprayag line (via Chamoli) --- (Central sector) Uttarakhand Completed Yes Under construction, also see Char Dham Railway. Map
Tanakpur–Jauljibi line --- Nepal (Central sector) Uttarakhand No No Not commenced Map
Tanakpur–Bageshwar line --- (Central sector) Uttarakhand No No Not commenced Map
Jammu–Akhnoor–Poonch line --- (Western sector) Jammu and Kashmir No No Not commenced Map
Patti–Ferozepur line --- Pakistan (Western sector) Punjab No No Not commenced Map
Anupgarh–Chattargarh–Motigarh–Bikaner line --- Pakistan (Western sector) Rajasthan No No Not commenced Map
Jodhpur–Agolai–Shergarh–Phalsund line --- Pakistan (Western sector) Rajasthan No No Not commenced Map
Jodhpur–Jaisalmer line doubling --- Pakistan (Western sector) Rajasthan Yes Map

Higher-Speed Rail Project

Train Number Project Photo Location Status Description
Mumbai–Ahmedabad high-speed rail corridor High-speed rail line Gujarat and Maharashtra Under construction India's first high-speed rail line
Silver Line (K-Rail) High-speed rail Thiruvananthapuram and Kasaragod Planned The Silver Line is a proposed higher-speed rail line in India that would connect Thiruvananthapuram, the capital city, and Kasaragod of Kerala state.
Vande Bharat (trainset) (Train 18) Semi high-speed rail List of Vande Bharat Express in service Completed The Vande Bharat Express, previously known as Train 18, is a semi-high-speed, electric multiple unit train operated by the Indian Railways on 18 routes as of June 2022. It was designed and manufactured by the Integral Coach Factory (ICF) at Perambur, Chennai under the Make in India initiative.
Amrit Bharat Semi high-speed rail Completed
Namo Bharat (trainset) Semi high-speed rail Completed 10 trainsets have been delivered till now.
Vande Bharat (sleeper trainset) Semi high-speed rail Under construction With the induction of the sleeper version of Vande Bharat, Indian railways aim to complete Delhi-Mumbai and Delhi-Kolkata journeys in 12–14 hours.
Mission Raftaar Semi high-speed rail Under construction

Urban Rail Transit

System Locale State / Union Territory Lines Stations Length (Under Construction) Length (Planned) Construction began Planned Opening
RapidX New Delhi, Ghaziabad & Meerut Uttar Pradesh 1 22 17 km (11 mi) 82 km (51 mi) 2020 2023

Normal System

System Locale State / Union Territory Lines Stations Length (Under Construction) Length (Planned) Construction began Planned Opening
Bhoj Metro Bhopal Madhya Pradesh 2 28 27.87 km (17.32 mi) 77 km (48 mi) 2018 March 2024
Indore Metro Indore Madhya Pradesh 5 89 16.21 km (10.07 mi) 33.53 km (20.83 mi) 2018 August 2024
Patna Metro Patna Bihar 2 26 16.86 km (10.48 mi) 30.91 km (19.21 mi) 2020 August 2027
Surat Metro Surat Gujarat 2 38 40.35 km (25.07 mi) 40.35 km (25.07 mi) 2021 December 2027
Cuttack–Bhubaneswar–Puri Metro Cuttack, Bhubaneswar, Puri Odisha 1 20 26 km (16 mi) 30 km (19 mi) 2024 TBD
Thane Metro Thane Maharashtra 1 22 29 km (18 mi) TBD TBD
Chandigarh Metro Chandigarh Capital Region Chandigarh 5 TBD 64 km (39.7 mi) TBD TBD
Prayagraj Metro Prayagraj Uttar Pradesh 2 39 40 km (25 mi) TBD 2025
Varanasi Metro Varanasi Uttar Pradesh 2 21 29.235 km (18.166 mi) TBD TBD
Gorakhpur Metro Gorakhpur Uttar Pradesh 2 27 27.41 km (17.03 mi) TBD TBD
Ranchi Metro Ranchi Jharkhand 2 27 16.2 km (10.1 mi) TBD TBD
Coimbatore Metro Coimbatore Tamil Nadu 5 147 147 km (91 mi) 2018 2027
Madurai Metro Madurai Tamil Nadu 1 18 31 km (19 mi) TBD TBD
Salem Metro Salem Tamil Nadu 5 25 TBD TBD TBD
Visakhapatnam Metro Visakhapatnam Andhra Pradesh 3 54 76.90 km (47.78 mi) TBD TBD
Guwahati Metro Guwahati Assam 4 54 61.42 km (38.16 mi) TBD TBD
Greater Gwalior Metro Gwalior Madhya Pradesh 3 21 58.1 km (36.1 mi) TBD TBD
Dehradun Metro Dehradun Uttarakhand 2 73 73 km (45 mi) TBD TBD
Srinagar Metro Srinagar Jammu and Kashmir 2 28 25 km (16 mi) TBD TBD
Coimbatore Metro Coimbatore Tamil Nadu 5 147 147 km (91 mi) 2018 2027
Bareilly Metro Bareilly Uttar Pradesh 6 80 117.3 km (72.9 mi) TBD TBD

Amrit Bharat Station Scheme (World Class Railway Stations)

Project Image Location Status Notes Year (completion)
Anand Vihar Anand Vihar New Delhi Under Construction Indian Railways’ ambitious station redevelopment plan, the Indian Railway Station Development Corporation (IRSDC) will soon be working on giving the Anand Vihar railway station a new look that will be similar to any airport. -
Ayodhya Junction railway station Ayodhya Junction Ayodhya, Uttar Pradesh Completed - 2024
Banaras railway station Banaras railway station Uttar Pradesh Completed - 2019
Belagavi railway station Belagavi railway station Karnataka Completed - 2023
Bijwasan railway station Bijwasan railway station New Delhi Under Construction Bijwasan railway station is a railway station in Bijwasan neighborhood of South Delhi. 2024
Dharwad railway station Dharwad railway station Dharwad Completed - 2022
Hazrat Nizamuddin railway station Hazrat Nizamuddin railway station New Delhi Completed Indian Railways redevelops Delhi's Hazrat Nizamuddin railway station! As part of its station redevelopment and beautification drive, Indian Railways has upgraded the Hazrat Nizamuddin railway station of the national capital. Several passenger-friendly amenities have been added at the station in the past few years. 2019
Gandhinagar Capital railway station Gandhinagar Capital railway station Gandhinagar, Gujarat Completed Gandhinagar Capital is a major railway station with a 5-star hotel on its top in the city of Gandhinagar, Gujarat. 2019
Gurgaon Railway Station Gurgaon Railway Station Gurgaon, Haryana Completed Redevelopment project of the Gurugram Railway Station, with an estimated cost of ₹300 crore, through video conferencing. The design of the station building will reflect the local culture, heritage, and architecture and provide modern facilities to the passengers by ensuring universal access to the railway station. 2024
Gomti Nagar railway station Gomti Nagar railway station Lucknow, Uttar Pradesh Completed Prime Minister inaugurated Gomti Nagar station in Uttar Pradesh, redeveloped at a total cost of around Rs 385 crores. To cater to the increased future passenger footfall, this station has segregated arrival and departure facilities. It integrates both sides of the city. 2024
New Delhi railway station New Delhi railway station New Delhi Completed In March 2020, long-term plans for a public private partnership (PPP) to change the railway station to improve passenger flow was described, with the Rail Land Development Authority put in charge. 2021
Rani Kamalapati railway station Rani Kamalapati railway station Bhopal, Madhya Pradesh Completed The Ministry of Railways privatised Habibganj railway station in June 2017, making it India's first private railway station. The station will have facilities like a shopping complex, forex kiosk and eateries. 2019
Sir M. Visvesvaraya Terminal Sir M. Visvesvaraya Terminal Bangalore Completed Sir M. Visvesvaraya Terminal, Bengaluru railway station (station code: SMVB) is an Indian Railways train station located in Baiyyapanahalli, Bangalore in the Indian state of Karnataka. 2022
SSS Hubballi Junction SSS Hubballi Junction Hubli Completed The platform number 1 of Hubli Junction has a length of 1,507 metres, making it the longest railway platform in the world as of March 2023. 2023
Shri Mata Vaishno Devi Katra railway station Shri Mata Vaishno Devi Katra railway station Katra, Reasi district Completed Shri Mata Vaishno Devi Katra railway station is a railway station on the Jammu Udhampur Srinagar Baramulla Railway Link in the Indian Union Territory of Jammu and Kashmir. It mainly serves for the town of Katra where the major Hindu divine temple Shri Mata Vaishno Devi is situated. 2014
Varanasi City railway station Varanasi City railway station Varanasi, Uttar Pradesh Completed - 2024

Railway Industries

Project Type Location Status Notes
Marathwada Rail Coach Factory (MRCF), Latur - RVNL Rail factory Maharashtra Completed The Marathwada Rail Coach Factory, a project of RVNL in Latur, Maharashtra produced its first coach shell on Good Governance Day i.e. 25.12.2020. This state-of-the-art factory was set up and commissioned in just two years by RVNL to manufacture self-propelled trains for Indian Railways. Setting up of this factory was proposed in February 2018 and the Ministry of Railways assigned this project to RVNL. Vande Bharat Express production to start in the factory in the near future.
Medha Servo Drives Railway coach factory Kondakal, Hyderabad Under Construction Medha Servo Drives, which designs and manufactures high-tech electronics for locomotives, is setting up a railway coach factory at Kondakal near Hyderabad in Telangana, involving an investment of Rs 1,000 crore.
RINL Forged Wheel Plant Wheel factory Raebareli Completed -
Rail Coach Naveenikaran Karkhana (RCNK) - RVNL Rail factory Sonipat Completed Rail Vikas Nigam Limited successfully commissioned the Rail Coach Naveenikaran Karkhana at Sonipat, Haryana in October 2021. The company had been entrusted with the development of this Rail Coach Workshop as a turnkey project. The Rail Coach Naveenikaran Karkhana at Sonipat is the first of its kind facility being set up to cater to the mid-life rehabilitation and refurbishment of coaches. The Rolling Stock Complex is designed for sustainable development with Industry 4.0 compliant assembly line. Vande Bharat Express production to start in the factory in the near future.
Railway Manufacturing Unit (RMU) Wagon Factory Kazipet, Telangana Under construction Indian Railways is going to set up a railway wagon manufacturing unit in Telangana. The unit will be constructed on 160 acres of land in Kazipet at an estimated cost of ₹521 crore and is expected to be completed by February 2025. The Rail Vikas Nigam Limited (RVNL) was entrusted with this project.